Family Day Skate Enderby Arena

Enderby Arena Shuts Down For Rest of Ice Season

The City of Enderby has discovered a problem with the refrigeration system at the Enderby Arena and Curling Rink. This problem will require the immediate shut down of the system to perform the necessary repairs and prevent damage. The City has been advised by its refrigeration mechanic and an engineer that, if the system is not shut down, there will be damage to its components and, should that occur, there will be a significant risk of a safety hazard.

Unfortunately, a sudden increase in corrosion inside of the refrigeration system has led to a build-up of sediment affecting one of its critical components. As a result, brine circulation pumps are drawing air into the system. If left unchecked, this causes deterioration in the system. The City is shutting down the system out of an abundance of caution. The safety of the public and workers is the City’s number one priority.

After shutting down the system, the affected component will be cleared of sediment and the source of the corrosion replaced. As the ice season ends in early March, this will result in the cancellation of rest of the season. Refunds will be provided to affected groups.

The City apologizes to arena and curling users for the inconvenience and thanks them for their patience and understanding as we work to remedy this problem in our facility and return to regular operations for the start of the 2024 ice season in September.

Last Updated on March 21, 2024.